Project Summary

To date, the ANLEC R&D science program for the SW Hub has included 14 projects examining various aspects of the carbon storage based on the available 2D seismic acquisition and well bore data from Harvey-1.

This project seeks to monitor and facilitate the integration of results from these, and future SW Hub projects, to best provide the SW Hub demonstration with the information it needs to optimise the exploration of the site.

This report is confidential. For more information please contact ANLEC R&D.

Project Name:
SW Hub Stage 1 Science Integration

Research Organisation:
CSIRO

Status:
Completed, 2017

Authors:
Dr Steve Whittaker and Dr Linda Stalker

Reference:
7-0314-0225

Research Program: Carbon Transport + Storage
Demonstration: Southern Perth Basin
Research Focus: Public Acceptance, Long Term Liabilty

Back to Project Search